The team will design, build and operate an optimized engineering scale (0.5 MWe) mixed-salt process (MSP) test system at the University of Illinois…
Office of NEPA Policy and Compliance
January 13, 2021The team will design, build and operate an optimized engineering scale (0.5 MWe) mixed-salt process (MSP) test system at the University of Illinois Abbott Power Plant.