The objective of the project is to perform a Phase I feasibility study on the integration of a 10-MWh-e sand-based thermal energy storage (SandTES)…
Office of NEPA Policy and Compliance
January 19, 2021The objective of the project is to perform a Phase I feasibility study on the integration of a 10-MWh-e sand-based thermal energy storage (SandTES) system to Southern’s coal-fired Plant Gaston.