CX-022946: Construction of Powerlines for CY 2021

MSA/HMIS to perform construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less withi…

Office of NEPA Policy and Compliance

December 12, 2020
minute read time

MSA/HMIS to perform construction of electric powerlines approximately 10 miles in length or less, or approximately 20 miles in length or less within previously disturbed or developed powerline or pipeline rights-of-way.