The proposed action is to install a water line (approximately 15 to 20 feet in length) to support filling of a cooling tower chemical injection ba…
Office of NEPA Policy and Compliance
April 28, 2020The proposed action is to install a water line (approximately 15 to 20 feet in length) to support filling of a cooling tower chemical injection barrel located in area 005 of the Hot Fuel Examination Facility (HFEF) basement.