CX-021025: Specific Manufacturing Capability (SMC) Pavement and Replacement Plan

This revision captures changes to project scope. The proposed action no longer includes a new trench drain between buildings Test Area North (TAN)-…

Office of NEPA Policy and Compliance

November 18, 2019
minute read time

This revision captures changes to project scope. The proposed action no longer includes a new trench drain between buildings Test Area North (TAN)-679 and TAN-629 at the Specific Manufacturing Capability (SMC).