CX-270470: C-531 Switchyard Bypass

DOE at the Paducah Gaseous Diffusion Plant (PGDP) plans to design and construct a new electrical distribution system to bypass the C-531 Switchyard.

Office of NEPA Policy and Compliance

February 1, 2019
minute read time

DOE at the Paducah Gaseous Diffusion Plant (PGDP) plans to design and construct a new electrical distribution system to bypass the C-531 Switchyard.