The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to remove the 2707-E11 li…
Office of NEPA Policy and Compliance
August 14, 2019The U.S. Department of Energy (DOE), Richland Operations Office (RL), Infrastructure and Services Division (ISD) proposes to remove the 2707-E11 lift station at the Grout Dry Material Facility in 200 East Area of the Hanford Site and install a gravity flow sewer pipeline.