Work will consist of conducting a pilot test involving the installation of interval control valves (ICVs) into existing horizontal injection and pr…
Office of NEPA Policy and Compliance
July 29, 2019Work will consist of conducting a pilot test involving the installation of interval control valves (ICVs) into existing horizontal injection and production wells. Monitoring of the ICVs.