CX-020143: Phase II: Large Pilot Testing of MTR Membrane Post-Combustion CO2 Capture Process (Phase II Downselect)

The objective of Phase II is to perform Front-End Engineering Design (FEED) study, NEPA documentation, and finalize project cost projections for th…

Office of NEPA Policy and Compliance

June 18, 2019
minute read time

The objective of Phase II is to perform Front-End Engineering Design (FEED) study, NEPA documentation, and finalize project cost projections for the Phase III construction and operation phase.