Western Area Power Administration (WAPA) plans to conduct geotechnical investigations at up to 26 locations to determine if transmission line const…
Office of NEPA Policy and Compliance
June 10, 2019Western Area Power Administration (WAPA) plans to conduct geotechnical investigations at up to 26 locations to determine if transmission line construction would be fiscally and technically feasible in the Parker, Arizona area.