CX-020026: DPT Borings and Hand Augering to Collect Soil Samples

At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples to a depth of 10-ft at 19 locations. At the Ford Building (690-N) 27 hand aug…

Office of NEPA Policy and Compliance

April 5, 2019
minute read time

At the Scrap Lumber Pile 631-2G a DPT rig will collect soil samples  to a depth of 10-ft at 19 locations.  At the Ford Building (690-N) 27 hand auger locations will go to a depth of 4-ft to collect soil samples, and at an additional 5 locations soil samples will be collected at depth as well as a groundwater sample at 50-60 ft.  At the ECODS N-1 a DPT rig will collect soil samples to a depth of 20-ft at 11 locations, and at an additional 3 locations soil and groundwater samples will be collected to a depth of 55-ft.  Additional sample locations may become necessary as the characterization progresses.