Western Area Power Administration Desert Southwest Region proposes to replace broken conductor line wires near structure 166-1 along the Peacock-Li…
Office of NEPA Policy and Compliance
March 19, 2019Western Area Power Administration Desert Southwest Region proposes to replace broken conductor line wires near structure 166-1 along the Peacock-Liberty 345 kilovolt Transmission Line in Yavapai County, Arizona. Repair crews will drive to 166-1 tower span location and use an insulated man-lift bucket vehicle to replace the broken frayed conductor wire. Western Area Power Administration repair crews will stay within the Right-of-Way and utilize existing access roads to conduct the repair.