Categorical Exclusion Determinations: B6.6

N and HS personnel will be conducting 500KW generator testing over the course of the next two to three years with approximately 500 hours of operat…
Capability Enhancement at the 325 Hazardous Waste Treatment Units CX(s) Applied: B6.6 Date: 04/16/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Interim Storage Area for Interim Storage Containers (ISCs) at the Radioactive Scrap and Waste Facility (RSWF) CX(s) Applied: B6.6 Date: 08/16/2013 Location(s): Idaho Offices(s): Nuclear Energy