Categorical Exclusion Determination
Office of NEPA Policy and Compliance
November 19, 2018Bonneville Power Administration proposes to reconstruct an approximately 2,142-foot-long by 35-foot-wide segment of the off-Right of Way access road that connects structures 88/4 and 89/3 of the Alvey-Fairview No. 1 transmission line.