CX-018549: San Juan Islands Cable System Equipment Upgrade – Decatur Island

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

August 2, 2018
minute read time

Bonneville Power Administration proposes to upgrade the San Juan Islands transmission cable system monitoring equipment within existing vaults on east and west Decatur Island. Excavation would occur adjacent to the vaults to bring cable from existing conduit into the vaults and to connect to the existing above ground control cabinets.

CX-018549.pdf (315.4 KB)