CX-018615: Required Network Upgrades Between Mandan and Ward Substations, as a Result of Foxtail Wind Interconnection into Midcontinent Independent System Operator System

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

March 6, 2018
minute read time

The Proposed Action is to upgrade approximately 4.5 miles of existing WAPA Mandan-Ward 230 kV transmission line by installing higher capacity lines atop existing towers.