CX-018500: Exploratory Dig at Seaway Dock Terminal

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

July 19, 2018
minute read time

Subcontractor shall provide all labor, tools, equipment, materials, consumables, services, transportation, storage and supervision necessary to perform an exploratory dig at Seaway Dock Terminal. The subcontractor shall perform an exploratory excavation using the hydrovac vacuum extraction method and hand excavation to obtain the actual depth of the pipeline to the top-of-pipe, verify the size of the pipe and that there is a straight section of pipe at least 6 feet long with no fittings or branches.

CX-018500.pdf (139.99 KB)