CX-018221: Advanced Test Reactor Complex Potable Water Well

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

May 23, 2018
minute read time

The Advanced Test Reactor needs an additional potable water source. The proposed action drills a new water well and installs a new pump near the current potable water well outside the main perimeter fence at the northeast corner of the Advanced Test Reactor Complex. The new system ties into the Advanced Test Reactor Complex potable water supply system. The proposed well allows the water supply to be switched from one well to the other to perform maintenance or if one of the pumps fails.

CX-018221.pdf (111.54 KB)