Categorical Exclusion Determination
Office of NEPA Policy and Compliance
June 19, 2018Bonneville Power Administration proposes to grant an easement to Comcast for the installation of an aboveground fiber coaxial cable, which would be attached to another utility company’s poles that cross through BPA’s North Bonneville-Ross-No. 1 and No. 2 transmission lines. The project would not involve ground disturbance.