The existing 115-kilovolt power line from L-Area to H-Area passes along the west edge of the Tritium Facility. This project will relocate the power line approximately 800 feet west to the west side of Road 4 to allow for future growth of the Tritium Facility. The scope includes the preparation of Site Clearance and Site Use Permits and supporting design for the construction of a right-of-way for the power line, coordination of Site and SCE&G design and construction activities. The actual power line construction and relocation work will be conducted by SCE&G. 