CX-017979: S8G Cooling Tower Replacement Project

Categorical Exclusion Determination

Office of NEPA Policy and Compliance

April 9, 2018
minute read time

The scope of the S8G Cooling Tower Replacement Project consists of: (1) Design of the replacement cooling tower; (2) Demolition of the current S8G Cooling tower; (3) Construction of a replacement cooling tower on the existing basin; and (4) Replacement of cooling tower controls, fire detection, electrical systems, cooling tower bypass valve, and the Cooling Tower Equipment Shed.

CX-017979.pdf (1.66 MB)