Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 9, 2018The scope of the S8G Cooling Tower Replacement Project consists of: (1) Design of the replacement cooling tower; (2) Demolition of the current S8G Cooling tower; (3) Construction of a replacement cooling tower on the existing basin; and (4) Replacement of cooling tower controls, fire detection, electrical systems, cooling tower bypass valve, and the Cooling Tower Equipment Shed.