Categorical Exclusion Determination
Office of NEPA Policy and Compliance
April 18, 2018This project will design and fabricate a 0.5 Megawatt electric carbon dioxide membrane pilot unit, install pilot unit at Technology Centre Mongstad in Norway, operate, decommission, and analyze test data.