CX-000785: Categorical Exclusion Determination

Construction of 241-TY Interim Surface BarrierDate: 08/18/2009Location(s): Benton County, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland Office

Office of NEPA Policy and Compliance

August 18, 2009
minute read time
Construction of 241-TY Interim Surface Barrier

Date: 08/18/2009
Location(s): Benton County, Washington
Office(s): Environmental Management, Office of River Protection-Richland Office

The U.S. Department of Energy, Office of River Protection proposes to construct an interim surface barrier to cover the TY Tank Farm. The TY Farm Interim Surface barrier is a Resource Conservation and Recovery Act interim measure for the TY tank farm in the 200 West Area. Construction of the barrier will involve placing and compacting fill material in the tank farm to establish a 0.8% slope to facilitate drainage from the east side to the west side of the farm.