Coal-Based Integrated Gasification Fuel Cell Project: Phase IICX(s) Applied: B3.6Date: 09/16/2011Location(s): South Windsor, ConnecticutOffice(s): ...
Office of NEPA Policy and Compliance
September 16, 2011Coal-Based Integrated Gasification Fuel Cell Project: Phase II
CX(s) Applied: B3.6
Date: 09/16/2011
Location(s): South Windsor, Connecticut
Office(s): Fossil Energy, National Energy Technology Laboratory
United Technologies Company Power will test a 25 kilowatt solid-oxide fuel cell stack at their facility in South Windsor, Connecticut.