Groundwater Monitoring Well Installation at Heavy Water Component Test ReactorCX(s) Applied: B3.1Date: 06/25/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
Office of NEPA Policy and Compliance
June 25, 2009Groundwater Monitoring Well Installation at Heavy Water Component Test Reactor
CX(s) Applied: B3.1
Date: 06/25/2009
Location(s): Aiken, South Carolina
Office(s): Environmental Management, Savannah River Operations Office
Three monitoring wells will be installed around the Heavy Water Component Test Reactor (HWCTR, Building 770-U) located in B-Area. The wells will be 135 feet deep and 2 inches diameter. The wells will be installed using a rotosonic rig. The area is not radiologically posted.