2018 (2nd Round)
The following projects were selected under the Funding Opportunity Announcement titled "U.S. Industry Opportunities for Advanced Nuclear Technology Development" (DE-FOA-0001817) - 2nd round of calendar year 2018 (application due date of April 30, 2018)
![Solid Black Line Divider](/sites/default/files/styles/full_article_width/public/2018/07/f54/Solid%20Black%20Line.png?itok=B5ZZAFtv)
![Solid Black Line Divider](/sites/default/files/styles/full_article_width/public/2018/07/f54/Solid%20Black%20Line_2.png?itok=Gmud003m)
Tier I: First of a Kind (FOAK) Nuclear Demonstration Readiness Projects
![NuScale Power, LLC Logo](/sites/default/files/styles/full_article_width/public/2018/08/f54/NuScale%20Power_New.png?itok=Ni5TpTJI)
NuScale Power, LLC
Corvallis, OR
NuScale Small Modular Reactor First-Of-A-Kind Nuclear Demonstration Readiness Project (Phase 2)
Builds on Phase 1 activities to advance the licensing and design maturity of a small modular reactor.
![Solid Black Line Divider](/sites/default/files/styles/full_article_width/public/2018/07/f54/Solid%20Black%20Line_0.png?itok=qlMCwLBb)
Tier II: Advanced Reactor Development Projects
![Columbia Basin Consulting Group, LLC Logo](/sites/default/files/styles/full_article_width/public/2018/07/f54/Columbia%20Basin%20Consulting%20Group_Larger%20R1.png?itok=RWusW6wf)
Columbia Basin Consulting Group, LLC
Kennewick, WA
Conceptual Engineering for a Small Modular Reactor (SMR) power plant based on Lead-Bismuth Fast Reactor (LBFR) Technology
Aims to develop a pre-conceptual design and preliminary cost estimate for a Lead-Bismuth Small Modular Reactor.
![GE Hitachi Nuclear Energy Americas, LLC Logo](/sites/default/files/styles/full_article_width/public/2018/07/f54/GE%20Hitachi_Larger%20R1.png?itok=YoUvdple)
GE-Hitachi Nuclear Energy Americas, LLC
Wilmington, NC
Reactor Plant Cost Reduction to Compete with Natural Gas Fired Electrical Generation
Examines ways to reduce reactor plant construction and maintenance costs through (a) elimination of Loss of Coolant Accidents (LOCAs), (b) the use of an embedded (below grade) design and construction and (c) the use of pooled off-site resources that can be applied simultaneously at multiple sites.
![Electric Power Research Institute, Inc Logo](/sites/default/files/styles/full_article_width/public/2018/07/f54/Electric%20Power%20Research%20Institute_Larger%20R2.png?itok=vT4frcH1)
Electric Power Research Institute, Inc.
Palo Alto, CA
Experimental Verification of Post-Accident Integrated Pressurized Water Reactor (iPWR) Aerosol Behavior, Phase 3
Further improves the models used to estimate the post-accident radionuclide concentration levels for integrated pressurized water reactors.
![Flibe Energy, Inc Logo](/sites/default/files/styles/full_article_width/public/2018/07/f54/Flibe%20Energy%20R2.png?itok=0pbpQJLK)
Flibe Energy, Inc.
Madison, AL
Fluorination of Lithium Fluoride-Beryllium Fluoride (Flibe) Molten Salt Processing
Builds on Pacific Northwest National Laboratory's research to examine nitrogen trifluoride as an agent to remove uranium from a molten-salt fuel mixture prior to reductive extraction of fission products, as well as extends this work to the fluorination of lithium fluoride-beryllium fluoride salt mixtures containing uranium tetrafluoride.
![Holtec International Logo](/sites/default/files/styles/full_article_width/public/2018/07/f54/Holtec%20International_Larger%20R2.png?itok=wCK0SYBx)
Holtec International
Camden, NJ
Advancing and Commercializing Hybrid Laser Arc Welding (HLAW) for Nuclear Vessel Fabrication, Including Small Modular Reactors
Advances Hybrid Laser Arc Welding for use in fabrication of Small Modular Reactors and dry storage canisters for spent nuclear fuel.
![Solid Black Line Divider](/sites/default/files/styles/full_article_width/public/2018/07/f54/Solid%20Black%20Line_1.png?itok=nJThy5eF)
Tier III: Regulatory Assistance Grants
![Pittsburgh Technical, LLC Logo](/sites/default/files/styles/full_article_width/public/2018/07/f54/Pittsburgh%20Technical%20R2.png?itok=1_ouKZUH)
Pittsburgh Technical, LLC
Pittsburgh, PA
Regulatory Support for Advanced Light Water Reactor Deployment: Advanced Boiling Water Reactor Source Term Reduction
Develops a technical basis to potentially reduce source terms associated with Level II and Level III probabilistic risk assessments for advanced boiling water reactors.
Disclaimer: All product and company names used on this site are the trademarks of their respective holders. Reference herein to any specific commercial company, product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors.