Audit Report: IG-0565

Salt Processing Project at the Savannah River Site

Office of Inspector General

August 27, 2002
minute read time

August 27, 2002 

Salt Processing Project at the Savannah River Site

As a result of Cold War weapons production, the Department of Energy accumulated millions of gallons of high-level waste that now require treatment and final disposal. At the Department's Savannah River Site, there are approximately 38 million gallons of high-level waste, including 35 million gallons of salt waste and 3 million gallons of sludge. To treat the salt waste, the Department originally planned to process the waste through the Savannah River Site's In-Tank Precipitation Facility so that cesium and other radionuclides could be removed. However, in February 1998, the Department suspended operation of the In-Tank Precipitation Facility because it could not be operated safely.