Avery, at center, tours the ETEC site with the EM team, including, from left, Karen Edson, Cathy Tullis, Robert Seifert, Josh Mengers, Kristen Ellis, Pam Hartman, John Howard and Jack Zimmerman. EM has been performing continuous environmental monitoring using air monitoring stations around the perimeter of the ETEC site. The cleanup program has also been conducting ongoing groundwater monitoring, collecting samples from the more than 100 wells that EM installed at the site to monitor, analyze and help understand groundwater contamination and inform cleanup actions.

DOE EM

February 14, 2025