EM Newsletters

A groundwater diagram
A groundwater treatment well that EM installed two years ago at the Idaho National Laboratory Site is working in parallel with a pump-and-treat system to yield great dividends for the water quality of the underlying Snake River Plain Aquifer.
A large group of people post for a picture
The Oak Ridge Office of Environmental Management and cleanup contractor UCOR recently hosted a new safety culture assistance team that will visit DOE worksites to identify strengths and any gaps to excellence.
Aerial shot of a laboratory
EM project managers at the Idaho National Laboratory (INL) Site have released a draft document to the public proposing a final end state for residual granulated calcine waste, piping, tanks and equipment associated with historic spent nuclear fuel reprocessing.