EM Newsletters

EM workers demolish a large industrial cooling tower built in 1952 at the Savannah River Site.
EM and the management and operations contractor at the Savannah River Site (SRS) have torn down a large industrial cooling tower built in 1952, part of more than 85,000 cubic feet of waste and scrap material removed from the site’s D Area complex.
EM’s contractor at the Idaho National Laboratory (INL) Site, sponsors Family STEAM Day at the Zoo. Each science, technology, engineering, arts, and math (STEAM) station at the event is designed to stimulate the interest & creativity of students.
More than 1,250 students who visited the Idaho Falls Zoo in 2021 were treated to a bonus: the opportunity to learn more about science, technology, engineering, arts, and math (STEAM).