Blog

Hanford Moves Closer to Tank Waste Pretreatment

EM’s Office of River Protection made another step toward pretreatment of tank waste on the Hanford Site.

Office of Environmental Management

January 19, 2021
minute read time
Hanford Moves Closer to Tank Waste Pretreatment

RICHLAND, Wash.EM’s Office of River Protection made another step toward pretreatment of tank waste on the Hanford Site. Workers with Hanford contractor Washington River Protection Solutions recently installed three ion exchange columns and two filter assemblies at the Tank Side Cesium Removal system. This equipment will provide a safe and efficient near-tank treatment technology to remove radioactive cesium from tank waste. The resulting treated waste will then be fed directly to the Low-Activity Waste Facility at the Waste Treatment and Immobilization Plant to be vitrified, or immobilized in glass. Testing of the equipment is scheduled to begin in a few weeks.

Tags:
  • Environmental and Legacy Management
  • Nuclear Energy
  • Decarbonization
  • Clean Energy
  • Energy Efficiency