Enterprise Assessments Assessment of the Savannah River Site Fire Protection Program as Implemented at the H-Canyon and K-Area – June 2017

Assessment of the Fire Protection Program as Implemented at the H-Canyon and K-Area at the Savannah River Site

Office of Enterprise Assessments

June 14, 2017
minute read time

June 2017

Assessment of the Fire Protection Program as Implemented at the H-Canyon and K-Area at the Savannah River Site

The U.S. Department of Energy (DOE) Office of Nuclear Safety and Environmental Assessments, within the independent Office of Enterprise Assessments (EA), conducted an assessment of the Savannah River Site (SRS) fire protection program as implemented at the H-Canyon and K-Area, which are operated by Savannah River Nuclear Solutions, LLC (SRNS).  EA sampled fire protection program implementation for the H-Canyon Target Residual Material project and the K-Area Interim Surveillance Vault facility to provide data for this assessment.